Romfeya UBP

“Manufacturing” module

The shop floor scans. The system calculates.

You plan against actual stock, operators record the steps with a barcode scanner, and on completion the system issues the documents and calculates what each product costs.

Sound familiar?

Three questions the shop floor has to answer

What does one product cost us?

The cost is calculated on every completion – from the materials consumed, the additional resources and the scrap – and updates the item’s base price.

Do we have the material for this order?

The request is broken down to raw materials and compared with what is in stock. If there is an actual shortage, you get a notification before the work has started.

How far has the order got?

Every scanned step is recorded with its time. The first scan marks the start of the job, and the dashboard shows what remains.

1 · The recipe

You describe the product once

A production cycle is a reusable recipe: what goes in, which steps are carried out and what comes out. One cycle can have several outputs – a main product and an offcut, for example.

  • Consumption rate as a fraction, a percentage or “once per n products” – accurate to the eighth decimal place
  • Additional resources – electricity, water, labour – with a price per cycle
  • For every output: scrap percentage, serial number, expiry date, diagrams with measurements
  • A cycle that has been used is locked – the documents already issued preserve the history

2 · Planning

One request – the whole plan

You request an item and a quantity. The system picks the recipe, breaks the requirements down to raw materials and deducts what is in stock. Missing components that have a recipe of their own become additional jobs in the same request.

  • Stock on hand is deducted once, even when a component appears in several places
  • For purchased materials – a notification only on an actual shortage
  • Manual pool: you pick cycles and chains and arrange them by dragging
  • Optionally, the request is created automatically – from the customer’s order

3 · Execution

A job card with a barcode for every step

A card is printed for every job: what goes in, what comes out and what the steps are. The operator scans the step’s barcode and the step is recorded – with the exact time.

  • Code128 barcodes – for the job and for every step
  • Works with an ordinary barcode scanner or with manual entry
  • A wrong or repeated code does not stop the work – the line supervisor gets a notification
  • The steps already recorded are marked on the card

4 · Completion and cost

The documents are issued automatically. The cost is the actual cost.

The supervisor ticks the jobs that are done and presses “Complete selected”. The system issues the inventory documents, records the serial numbers and allocates the cost between the outputs – by quantity and weighting. Which documents are issued is set in the production settings; the usual set-up is this:

Materials for productionissues what was consumed
Goods from productionreceives what was produced
Scrapped goodsseparates what was scrapped
  • If inputs are short, completion does not stop – a warning and a notification are raised
  • A job cannot be completed twice

Tool health

Wear accumulates with every run – per serial number or in total. The dashboard shows how much service life remains.

Reverse production and chains

The system also supports the reverse route – disassembling or unbundling a product into its component parts.

  • Predefined chains – sequential or parallel cycles for complex products
  • The pool is sorted in order of execution – the deepest prerequisite comes first
  • An inactive cycle is neither requested nor executed; jobs already queued are still completed

Honestly

What exists today and what is to come

The statuses follow the functional specification – with the changes since version 1.1.

built partial planned

The full specification

FeatureStatus
Recipes with steps, inputs, resources and outputsbuilt
Request breakdown to raw materialsbuilt
Job card and scanning by jobbuilt
Documents, serial numbers and cost on completionbuilt
Automatic production request from a documentbuilt
Purchase order to the main supplier for the missing materialscreated automatically, when enabledbuilt
Creating cycles from a templateplanned
Measurements shown on the diagramplanned

Run a job in the demo environment

Request 14 days of access and follow the path from request to cost with sample data.